| |

|
|
Kensington
140
St. Albans Road
$815,000
open house -
Sunday March 7, 1-5pm AND
Sunday March 14th 2:30-6pm
Million Dollar Views! At the end of a coveted cul-de-sac, a stylish Mediterranean
is perfectly sited to enjoy breathtaking views of San Francisco Bay!
You walk down stone steps to a private patio, and enter into a generous
foyer leading to a light-filled living room overlooking the Bay.
The (approximately 17' X 25') living room has a soaring beamed ceiling,
gleaming oak floors and a brick fireplace. The charming dining room
faces south to the sun.
Main level has two bedrooms and two baths plus inside access to a double
garage. The lower level has a mirror-image of the large living room above;
a versatile space, equally at ease as a bedroom, office or separate au-pair.
Also on this level: a full bath, laundry room and workroom.
Truly unique Kensington property built in 1938 with care and attention
to quality materials.
|
| |
|
|
|
| |
St. Albans
living room
|
|
T.jpg)
St. Albans
living room 2 |
|

St. Albans
bedroom |
St. Albans
bedroom 2
|
|

St. Albans
dining room |
|
T.jpg)
St. Albans
family room |
St. Albans
bathroom
|
|

St. Albans
deck |
|
T.jpg)
St. Albans
view |
St. Albans
kitchen
|
|
T.jpg)
St. Albans
kitchen 2 |
|
|
|
|
|
| |
|
|
 |
| |

|
|
Richmond
5703
Van Fleet Ave
$449,000 - just listed 3/2010
- Single Family Property
- Status: ACTIVE
- Area: Richmond -Annex
- County: Contra Costa
- Subdivision: PANHANDLE ANNEX
- Year Built: 1953
- 3 total bedroom(s)
- 2 total bath(s)
- 2 total full bath(s)
- 6 total rooms
- Approximately 1328 sq. ft.
- Single story
- Style: Contemporary
- Fireplace(s)
- Garage
- Heating features: Central, Gas
- Approximate lot is 3700
- School District: West Contra Costa (510) 234-38
|
| |
|
|
|
| |
Van
Fleet
living room
|
|
T.jpg)
Van
Fleet
living room 2 |
|

Van
Fleet
dining room |
Van
Fleet
dining/living
|
|

Van
Fleet
bedroom |
|
T.jpg)
Van
Fleet
bedroom 2 |
Van
Fleet
bedroom/office
|
|

Van
Fleet
office |
|

Van
Fleet
backyard |
Van
Fleet
view
|
|

Van
Fleet
kitchen |
|
T.jpg)
Van
Fleet
bathroom |
|
|
|
| |
|
|
 |
| |
 |
|
Berkeley
1512 Allston Way
$489,000 -
SOLD
Charming Berkeley cottage in very convenient location! Freshly painted inside
and out with gleaming hardwood floors. Eat-In updated kitchen overlooks small
garden. Detached garage and offstreet parking. Near Downtown Berkeley, BART,
bus lines, casual carpool, shopping and restaurants. Perfect Starter!
- 2 Bedroom, 1 Bath (county records differ)
- Updated Eat-In Kitchen and Bath
- Refinished Hardwood Floors
- Light and Bright Living Areas--Beautiful Windows
- Detached Garage and Small Yard
|
| |
Allston
living room
|
|

Allston
living room 2 |
|

Allston
bedroom |
Allston
bedroom 2
|
|

Allston
bathroom |
|

Allston
dining |
Allston
kitchen
|
|

Allston
yard |
|
|
|
|
|
| |
|
|
 |
| |
 |
|
1625
Belvedere Ave.
Berkeley, CA 94702
$489,000 - SOLD
open sun 3/29 1:30 to 4:40
Quaint and charming Berkeley shingled cottage on great street! Remodeled with
flair! New quality kitchen and bath. Belvedere is a small street
tucked near Cafe Fanny, Kermit Lynch, North Berkeley BART, and Cedar-Rose Park. 2
bedroom, 1 bath compact layout with large, attached garage for multiple uses.
Most major systems either replaced or repaired including plumbing and electrical. New
roof, gutters, and high efficiency forced air furnace. Compliant
with City of Berkeley Sewer & RECO requirements. Bright home with good
east/west exposure and nice outdoor spaces. |
| |
|
|
|
| |
Belvedere
bedroom 1
|
|

Belvedere
bedroom 2 |
|

Belvedere
kitchen |
Belvedere
living room
|
|

Belvedere
yard |
|

Belvedere
yard 2 |
Belvedere
office nook
|
|

Belvedere
bathroom |
|

Belvedere
built by Burley
|
|
|
|
| |
|
|
 |
| |
 |
|
1327
Carlotta • Berkeley, CA
$697,000
2 Bedroom, 1 Bath
Charming Berkeley Cottage in Best Location!
First Open House Sunday 3/24 from 2-5pm
Charming 2 bedroom, 1 bath Craftsman Cottage near to everything beloved about
Berkeley! Bright and open floorplan with many windows and 'good light'. Classic
living room and formal dining room with refinished hardwood floors and fireplace. Updated
bath and fresh paint throughout. Large yard surrounded by trees. Right
around the corner you'll find great markets and food; tennis, track and swimming;
library, bookstores, restaurants, movies, AND easy access to BART & buses.
|
| |
|
|
|
|
| |
Carlotta
bedroom 1
|
|

Carlotta
bedroom 2 |
|

Carlotta
living room 1 |
Carlotta
living room 2
|
|

Carlotta
office nook |
|

Carlotta
dining/living |
Carlotta
dining/kitchen
|
|

Carlotta
kitchen |
|

Carlotta
bathroom |
Carlotta
backyard
|
|
|
|
|
|
| |
|
|
 |
|
| |
 |
|
LOTS
AVAILABLE:
1033 and 1045 Keeler Avenue
SOLD
Fantastic Opportunity! Two adjacent parcels available just above Remillard Park, between 1033 and 1045 Keeler Ave. Gorgeous & Tranquil
Setting. Lots are each approximately 50ft wide by 180ft deep, just east of Poppy
Path.
|
|
| |
|
|
|
|
| |
Keeler
Ave.
2 parcels
|
|

Keeler
Ave.
2 parcels |
|

Keeler
Ave.
2 parcels |
Keeler
Ave.
2 parcels
|
|

Keeler
Ave.
2 parcels |
|

Keeler
Ave.
2 parcels |
Keeler
Ave.
2 parcels
|
|
|
|
|
|
| |
|
|
|
|
| |

|
|
OAKLAND
8293 Skyline Circle
temporarily off the market, please call Nancy for more info
The Best of Both Worlds in the Oakland Hills!
This newer home high atop the Oakland Hills offers FANTASTIC views and a wonderful
indoor outdoor floorplan. The main floor with living room, dining area
and a kitchen-family room combination has gorgeous marble floors, two fireplaces,
and a built-in entertainment center with surround-sound. Enjoy views of
the bay from the top quality kitchen, yet still be able to go directly out to
the lovely garden for a barbeque! The kitchen features Cherry cabinets,
granite counters, and high end appliances. The upstairs three bedrooms
are nicely proportioned and the master suite has bay views. The open den
makes a great office or guest area. Though just minutes from the 580 freeway,
Skyline circle is a very private street just off of Skyline Blvd., and is close
to Chabot regional park, the equestrian center, and the Sequoyah Country Club. This
is a wonderful home in a very special setting!
|
|
| |
|
|
|
|
| |
Skyline Circle
living room
|
|

Skyline
Circle
living room |
|

Skyline
Circle
view
|
Skyline
Circle
living room to dinning room
|
|

Skyline
Circle
family room to kitchen |
|

Skyline
Circle
family room entertainment center |
Skyline
Circle
family room view
|
|

Skyline
Circle
kitchen |
|

Skyline
Circle
kitchen |
Skyline
Circle
kitchen
|
|

Skyline
Circle
master bedroom |
|

Skyline
Circle
master bath |
Skyline
Circle
bedroom
|
|

Skyline
Circle
bathroom |
|
|
|
|
|
|
| |
|
|
|
|
| |
|
|
|
|
| |
 |
|
BERKELEY
14 Rock Lane
$699,000.
this house closed for $865,000.
Fantastic Views & Expansive Lot in the Berkeley Hills!
3 bedroom, 1 bath home with spacious, open floor plan and great bay
views! Lower level studio has its own bath and a separate entrance.
Superb, deep lot with lish greenery, filled with unique plantings. Basement
storage and workshop area, plus a separate garage. Privacy
and delightful outlooks from this North Berkeley retreat! . |
|
| |
|
|
|
|
| |
Rock
Lane
living room
|
|

Rock
Lane
view |
|

Rock
Lane
bedroom |
Rock
Lane
walkway
|
|

Rock
Lane
garage |
|

Rock
Lane
kitchen |
Rock
Lane
kitchen 2
|
|

Rock
Lane
studio |
|
|
|
|
|
|
| |
|
|
|
|
| |
}}
page 2 3 4 5 of
listings |
|
|
|
| |
back
to top of page |
|
|
|